Carlisle · carlisle
Failed felt flat roof over an occupied office extension
Commercial office extension
- Phased over a working week
- Written diagnosis
- Fully insured work

24/7
Emergency roofing response across Cumbria and the Borders, answered day and night.

The problem
Ponding water and blistered felt over a meeting room in daily use. Patch repairs had been carried out twice and were failing at the same laps.
What we did
The solution
Survey and moisture check, strip back to deck, replace saturated boards, install a new warm-deck build-up with upgraded insulation and correctly formed falls and upstands.
Result
The outcome
A single-visit-per-phase programme worked around occupation, no internal disruption, and a roof with drainage that actually sheds water instead of holding it.
Specification
Materials and methods
- Warm-deck insulation
- High-performance single-ply membrane
- New OSB deck
- Formed GRP trims
Services
Services used on this job
More work
Other projects



North Cumbria
Leadwork and slate repairs to a village church
Book a survey on your roof
We inspect, report in writing with photographs, and give you repair-or-replace options with the reasoning behind each.
